CPS Case Studies
Generator upgrade works at Penmaenbach & Headland Tunnels
Date: 12/09/17
Customer: Welsh Government. Client: SPIE & Wales Transport Technology Consultant (WTTC). Scheme of Works: Generator upgrade works at Penmaenbach & Headland Tunnels. The Brief: As an on-going scheme of upgrade works on the A55 in... Read More
Site Power Infrastructure & Genset upgrade works
Date: 12/09/17
Customer: QIAGEN Client: QIAGEN Scheme of Works: Site Power Infrastructure & Genset upgrade works The Brief: When the Stockport & Manchester based Consultancy firm ECS Ltd were tasked to Design and Project Manage the Electrical... Read More
Honest, professional and competent
Date: 04/09/17
Our last project demanded a very short lead time combined with a technically bespoke specification. I found Central Power Services to be honest, professional and competent in all aspects of the project. I would be confident to recommend them for any... Read More
No hesitation in recommending CPS
Date: 04/09/17
As soon as I saw the standard of delivered equipment and the professional manner in which the installation was being performed, I was confident that I had chosen the right Company for the job. I would have no hesitation in recommending CPS Read More
Every confidence in recommending them
Date: 04/09/17
Thanks to CPS engineer’s recommendation for a thermal image survey on the changeover panel, we uncovered a problem, which if undiscovered, could have resulted in a major fire hazard within the hospital. Due to their proactive approach I have... Read More